Friday, September 24, 2010

St Dalfour Whitening Cream

Task 5 T42S10

I NFRASTRUCTURE Service in Los Molles, Region IV

Task 5 defines the first order for the second stage of the workshop, which will work on the definition of different service programs in the resort of Los Molles.


Study Topics
Organization of the form - Spatial Composition - Materials and Systems

Objective
Designing a general layout of the five attachments on this task, through its review and adjustment .

Following the methodology used during the first part of the workshop will be taken as a starting point the study of animal skins (mammals, reptiles, fish, birds, insects), meaning that its composition there natural patterns that establish a set of rules, configuration mode and order for the project.
The setup program should respect the design of animal skin and lifted previously observed , along with taking into consideration the performance of extrusion and its material, so as to be a consequence of the work developed in the first part of the workshop.

The invention construction / structure should be revised and developed according to this new program.
deform the path will be allowed proportionately if the program requires.


are asked to bring
1 - Print process: showing the work done in the first stage of the workshop, stressing the skin with which you are working, their uprising, photomontages, photographs of models of free materials and models of construction system.

2 - Floor plan 1 / 100:
surface, including lists of venues and proposed circulation system definition and proposal of full and empty. Be drawn including: a) Items sectioned. b) Levels of soil. c) Uses identified with furniture.

3 - Volumetric Model 1 / 100 scale: white cardboard or materials without express vain.

4 - Model
1 / 20:
In a significant fraction of the project that shows the current status of the building system / structural. The model will be free materials.

Delivery
Wednesday, 29 September, 15:00 hrs. chapel.

0 comments:

Post a Comment