Topography and soil work
Order
complicate the volumes are required in project development, from its relationship with soil or topography, seeking to establish a unpublished series of relationships with the place through deformation operations, overlap and repositioning of parts and components. Exercise
To build a model this volume 1 / 100 of the draft evaluation and only with silicone rubber.
The model will be photographed on 3 different surfaces in the home of each student, surfaces that generate distortions in the models. It is suggested to operate with cuts, cuts and stretching on the model of deformation mode, and reposition overlapping parts unpublished establishing relationships with selected topographies.
are asked to bring 1. Model of Goma Eva esc 1 / 100. We suggest using different colors.
2. Series of photos of the model chosen on each similar topography. (3 sets)
The photographs are in black and white, with an emphasis on lighting, excluding the frame elements do not correspond to topography or similar model.
3. Escaped Court esc 1 / 50 of the project site, material representations of place and photoshop project. The materials chosen should relate to the place of mimesis or antithesis.
4. Project views (2 outdoor and 2 indoor) on the landscape and its spatiality. Free technical. Delivery
Wednesday, 27 October, 15:00 hrs. Chapel
Friday, October 22, 2010
Advantages Of Turboprop Aircraft
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment